Cobblehop / New York routes / Upper East Side to UBS Arena

Upper East Side to UBS Arena by subway and LIRR

Quick answer: Take a downtown 6 train from 77 St to Grand Central-42 St, then take an LIRR train toward Hempstead from Grand Central to Elmont-UBS Arena. The trip takes about 58 minutes door to door on a weekday (55 to 59 depending on the connection). The 6 train comes about every 4 minutes during the day. The 6 train doesn't run from 77 St to Grand Central-42 St on weekends; the trip then uses another line. The 6 train runs only a few times from 77 St to Grand Central-42 St between about 1 and 5 am; then the trip uses another line.

Ask Cobblehop

Upper East Side to UBS Arena

Trip timeabout58min
How oftenAbout every 4 minutes (6)
  • 6
  • LIRR
  1. Walk 2 minto 77 St
  2. 6 6 trainFrom 77 St, downtown4 stops, about 7 min
  3. Change at Grand Central-42 StWalk about 9 min to Grand Central
  4. LIRR LIRR trainFrom Grand Central toward Hempstead2 stops, about 35 min
  5. Get off at Elmont-UBS Arena
  6. UBS Arena

Weekdays, fall 2026 MTA schedule · First and last trips

Step by step

  1. Walk about 2 minutes from Upper East Side to 77 St.
  2. Take a downtown 6 train from 77 St to Grand Central-42 St. It's 4 stops, about 7 minutes.
  3. At Grand Central-42 St, walk about 9 minutes to Grand Central for an LIRR train.
  4. Take an LIRR train toward Hempstead from Grand Central to Elmont-UBS Arena. It's 2 stops, about 35 minutes.

Times and frequency

From the MTA's fall 2026 schedule. Typical trip is the door to door time in the middle of the day.

DayFirst tripLast tripTypical tripLIRR train in the daytime
WeekdaysAround the clock (another line late at night)58 minAbout once an hour
SaturdayAround the clock (another line late at night)58 minAbout once an hour
SundayAround the clock (another line late at night)60 minAbout once an hour

Late at night

This trip works around the clock. Between about 1 and 5 am the trip takes about 66 minutes. The 6 train runs only a few times from 77 St to Grand Central-42 St between about 1 and 5 am, so at that hour the trip uses another line.

Tips for this trip

Step-free access

For the subway part of this trip: 77 St (6 platform) is not on the MTA's list of accessible stations; Grand Central-42 St (6 platform) is on the MTA's list of accessible stations. Elevators can be out of service, so check elevator status on mta.info before you go.

What it costs

Fares as of November 2026. Check the official fares page before you ride.

Upper East Side to UBS Arena: common questions

How do I get from Upper East Side to UBS Arena by public transit?

Take a downtown 6 train from 77 St to Grand Central-42 St, then take an LIRR train toward Hempstead from Grand Central to Elmont-UBS Arena.

How long does it take?

About 58 minutes door to door on a weekday, 55 to 59 depending on the connection.

Do I have to change along the way?

Yes, once: at Grand Central-42 St.

Does it run all night?

This trip works around the clock. Between about 1 and 5 am the trip takes about 66 minutes. The 6 train runs only a few times from 77 St to Grand Central-42 St between about 1 and 5 am, so at that hour the trip uses another line.

How much does it cost?

Subway and local bus: $3 per ride with OMNY (tap a contactless card or phone) or a MetroCard. One transfer within 2 hours to the subway or a local bus is included. LIRR: the fare depends on the fare zones and on peak or off-peak time. Peak = weekday trains arriving NYC terminals 6-10 a.m. or leaving them 4-8 p.m. Off-peak all other times, weekends and holidays. Buy in the MTA TrainTime app or at a station ticket machine before you board. Buying on the train costs $7.75-8.50 more (not charged where the station has no ticket machine).

Sources

Cobblehop is independent. It is not affiliated with the MTA or any transit agency. Schedules on this page come from the MTA's public GTFS data; check these pages for the latest service:

Transit data: Metropolitan Transportation Authority (MTA). Cobblehop is not affiliated with or endorsed by the MTA.

Published November 16, 2026. Times were computed from the MTA fall 2026 schedules for 2026-11-18 (weekday), 2026-11-21 and 2026-11-22. Planned work and holidays change service, so check Cobblehop for live times before you go.

Leaving now? Cobblehop gives you one clear plan with live times and alerts you before your stop.

Plan Upper East Side to UBS Arena now